The inland river of certain city has been polluted,by using the engineering methods such as interception,block,diffluence,dredging,water supplement,it achieves stage engineering effect currently and gets some experience for whole comprehensive regulation.
某市區(qū)內(nèi)河水系的水體受到污染,采用截、堵、疏通、分流、清淤、補(bǔ)水等工程做法,目前已取得階段性工程成效,為全面鋪開綜合整治獲得一定經(jīng)驗(yàn),可供借鑒。
,their make-up water condition was analyzed.
結(jié)合平頂山鴻翔熱電有限責(zé)任公司的4臺(tái)供熱機(jī)組運(yùn)行的實(shí)際情況和供熱情況,對(duì)該電廠供熱機(jī)組補(bǔ)水情況進(jìn)行分析,通過幾種補(bǔ)水方案的分析比較,從中找出最佳的補(bǔ)水方案,以提高電廠運(yùn)行效益。
It represents that in the systems of temporary high pressure water supply system of sprinkle fire,how to sets the height of the fire tanks,discusses that according to the different pattern sets,how to reasonable set the water replenishing of the fire tanks and the supervisory alarming signal of water level,to do well the design work of the fire tanks.
闡述了在自動(dòng)噴水滅火臨時(shí)高壓給水系統(tǒng)中,如何確定消防水箱的設(shè)置高度,探討了根據(jù)不同組合設(shè)置,如何合理可靠的設(shè)置消防水箱的補(bǔ)水與水位監(jiān)視報(bào)警信號(hào),以做好消防水箱的設(shè)計(jì)工作。
The causes of feed water failure are analyzed and the solution methods are presented on the design and debugging.
對(duì)純水補(bǔ)給系統(tǒng)關(guān)鍵點(diǎn)的壓力進(jìn)行了計(jì)算,分析了在裝置運(yùn)行過程中,造成補(bǔ)水故障的原因,提出了在設(shè)計(jì)和調(diào)試過程中的解決措施。
This paper briefly introduces the hydraulics research results of TGP lock under all kinds of operational modes during the cofferdam retaining water, including the navigation conditions in the upper approach channel, the problems of supplementary water of lock chamber No.
概述了在圍堰擋水發(fā)電期的各種運(yùn)行調(diào)度方案條件下,三峽永久船閘水力學(xué)研究成果,包括引航道內(nèi)通航水流條件、閘室內(nèi)補(bǔ)水及超灌(泄)問題,對(duì)船閘的運(yùn)行方式、閥門的操作提出了具體意見和措施,根據(jù)這些意見和措施,可以保證在此時(shí)期內(nèi)實(shí)現(xiàn)順利通航。
tificial recharge
人工補(bǔ)給;人工補(bǔ)給地下水;人工補(bǔ)水;人工灌注;回灌
UF Membrane on Supplement Water of Sight
超濾膜應(yīng)用于景觀補(bǔ)水的再生水處理
Last Study on Chemical Plant Sewage Reusing as Makeup Water of Circulation
化工廠區(qū)雨排水回用循環(huán)水補(bǔ)水及時(shí)研究
Impact of Water Replenishment from Guilin Qingshitan Reservoir on Water Environment of Lijiang River
桂林青獅潭水庫補(bǔ)水對(duì)漓江水環(huán)境的影響
Use of Intermediate Water as Make-up Water for Circulating Water in Sanhe Power Plant
中水作為循環(huán)水補(bǔ)水在三河電廠的應(yīng)用
The winter generally every day makesup the water many to2,000~3,000 milliliters.
冬季一般每日補(bǔ)水不少于2000~000毫升。
supplemental pumping
補(bǔ)充抽吸吸水源抽吸
and get their supply of air, food and water.
補(bǔ)給空氣、食品和飲水。
coefficient of recharge from irrigation
灌溉水入滲補(bǔ)給系數(shù)
automatic feeder for brine
鹽水溶液自動(dòng)補(bǔ)給器
compensation regulation computation of reservoir group
水庫群補(bǔ)償調(diào)節(jié)計(jì)算
Steam Boiler Drain as Make-Up Water for Hot Water System
以蒸汽鍋爐水作為熱水系統(tǒng)的補(bǔ)充水
Normal make-up and Emergency make-up are achieved directly in the Condensate Receiver Tank.
正常補(bǔ)給水和緊急補(bǔ)給水可以直接從凝結(jié)水回收箱中得到。
Fluids replacement should begin immediately.
立刻喝點(diǎn)水,以補(bǔ)充身體所需要的水分。
Specification for rock test of water resources and hydropower development(supplement port)
水利水電工程巖石試驗(yàn)規(guī)程(補(bǔ)充部分)
Safety of Drinking Water Added Iodine with Iodine?supplement Device
飲水補(bǔ)碘器加碘后飲水的安全性研究
Water Hammer Study of Make-up Water System in Thermal Power Plant
火電廠補(bǔ)給水系統(tǒng)水錘模擬計(jì)算研究
There are two different kinds of compensation methods for reservoir emigrants, the economic compensation and the policy compensation.
我國水庫移民補(bǔ)償分為經(jīng)濟(jì)補(bǔ)償和政策補(bǔ)償兩種。