Therefore, based on the field data obtained, stope stability can be forecasted.
在此基礎(chǔ)上, 可以根據(jù)獲得的現(xiàn)場資料, 預(yù)測采場的穩(wěn)定性.
互聯(lián)網(wǎng)
Some experiences on stope roof management in metal underground mine are introduced.
介紹金屬地下礦山采場頂板管理的幾點(diǎn)經(jīng)驗(yàn).
互聯(lián)網(wǎng)
This paper introduces the method of slope adjustment of stope face.
文章介紹了回采工作面的調(diào)斜方法.
互聯(lián)網(wǎng)
Liquid fluid system a stope is the principal part of in situ crushing leaching.
采場液流系統(tǒng)是原地破碎浸出的主體.
互聯(lián)網(wǎng)
The cause mine pillar destruction Tin Mine was analyzed from observation by photoelastic mine stope 570.
通過對埋設(shè)于570中段光彈性應(yīng)力計(jì)的觀測,分析了該中段礦柱破壞的情況及原因.
互聯(lián)網(wǎng)
Sound shoot in course of sandrock failure at stope top and floor is of twin - peak character.
大姚銅礦采場頂?shù)装迳皫r在破壞過程中聲發(fā)射具有雙峰性,主破裂前存在聲發(fā)射相對平靜現(xiàn)象.
互聯(lián)網(wǎng)
Furthermore, its tech - economic indices are compared with those of the sublevel open stope method.
并將技術(shù)經(jīng)濟(jì)指標(biāo)與分段空場法加以比較.
互聯(lián)網(wǎng)
Stope ground pressure control is a key issue in an open stope mining process.
采場地壓控制是空場采礦法開采工藝的關(guān)鍵環(huán)節(jié).
互聯(lián)網(wǎng)